Table of Contents

  1. Purpose & Scope
  2. Legal Requirements
  3. Site-Specific Emergency Plan
  4. Muster Points & Headcount
  5. Emergency Contacts
  6. Fire Evacuation Procedures
  7. Severe Weather Response
  8. Medical Emergency Response
  9. Critical Injury Notification
  10. Communication Equipment
  11. HCMI Emergency Plan Template
  12. Drills & Review

1. Purpose & Scope

Construction sites present unique emergency challenges: changing layouts, multiple trades working simultaneously, temporary structures, heavy equipment, and evolving hazards. This guide establishes HCMI's emergency response framework for every church construction project we manage in Ontario.

Every worker on an HCMI site must know the emergency plan before beginning work. The site supervisor reviews the emergency plan during the site orientation and at every major project phase change. Visitors must be escorted and briefed on evacuation routes and muster points before entering any active work area.

Regulatory Note: O. Reg. 213/91 s.17(1) requires that before work begins on a construction project, the constructor shall establish written procedures for emergencies. This is not optional. Every HCMI project must have a site-specific emergency plan posted in the site trailer and reviewed during orientation before any worker begins tasks.

3. Site-Specific Emergency Plan

Each HCMI church construction project must have a written emergency plan that addresses the unique conditions of that site. The plan must include:

The emergency plan is a living document. It must be updated whenever the site layout changes significantly, new hazards are introduced, or emergency personnel change. The site supervisor reviews the plan at minimum monthly.

4. Muster Points & Headcount

HCMI requires at least one designated muster point per project, located a minimum of 30 metres from the nearest building or structure and clear of vehicle traffic routes. For church projects with active congregation areas, muster points must be positioned to avoid interfering with church operations.

Headcount procedures:

  1. The site supervisor or designated person maintains a daily sign-in sheet for all workers, visitors, and delivery personnel on site.
  2. Upon evacuation, all personnel proceed to the muster point immediately.
  3. The site supervisor or designate conducts a headcount using the sign-in sheet within five minutes of the evacuation alarm.
  4. Any missing persons are reported to emergency services immediately. No one re-enters the site to search for missing persons.
  5. The all-clear is given only by the site supervisor after confirmation from emergency services that it is safe to return.

5. Emergency Contacts

The following emergency contacts must be posted at all HCMI site trailers, first aid stations, and at each muster point:

HCMI Requirement: The nearest hospital address and driving directions must be posted at the first aid station and in the site trailer. For rural church projects where hospital response may exceed 30 minutes, the emergency plan must identify the nearest ambulance base and expected response time.

6. Fire Evacuation Procedures

Construction sites have elevated fire risk due to hot work (welding, cutting, soldering), temporary heating, flammable materials, and exposed combustibles. HCMI fire evacuation procedures:

  1. Discovery: If you discover a fire, alert everyone in the immediate area by shouting "Fire!" loudly and clearly.
  2. Alarm: Activate the site fire alarm (air horn or designated alarm system). If none available, use a vehicle horn in three long blasts.
  3. Attempt to extinguish only if the fire is small (no larger than a waste basket), you have the correct extinguisher, you have a clear escape route behind you, and you have been trained in fire extinguisher use. If any condition is not met, evacuate immediately.
  4. Evacuate: Use the nearest safe exit route. Do not use elevators or hoists. Help anyone who needs assistance.
  5. Assemble: Proceed directly to the designated muster point.
  6. Report: The site supervisor calls 911 and conducts the headcount.
  7. Do not re-enter until the fire department gives the all-clear and the site supervisor authorizes re-entry.

Fire extinguisher requirements: ABC-rated extinguishers must be placed within 23 metres of travel distance from any point on the project, per the Ontario Fire Code. Extinguishers must be inspected monthly and annually serviced. Hot work requires a dedicated fire watch with an extinguisher for a minimum of 60 minutes after hot work ceases.

7. Severe Weather Response

Tornado Warning

  1. Monitor Environment Canada weather alerts. The site supervisor will sound the evacuation alarm if a tornado warning is issued for the area.
  2. All workers descend from heights immediately. Crane operations cease and the crane is secured.
  3. Take shelter in the lowest interior area of a permanent structure (e.g., the existing church basement if accessible and safe). If no permanent structure is available, workers move to a ditch or low-lying area away from vehicles, equipment, and trees.
  4. Stay sheltered until the tornado warning expires or the site supervisor gives the all-clear.

Lightning

  1. Apply the 30/30 rule: if the time between lightning flash and thunder is 30 seconds or less, all outdoor work stops.
  2. Workers at heights (scaffolds, roofs, steel structure) descend immediately at the first sign of an approaching electrical storm.
  3. Crane operations cease when lightning is within 16 km (10 miles) of the site.
  4. Take shelter in a permanent structure or an enclosed metal-bodied vehicle. Do not shelter under trees, scaffolding, or metal structures.
  5. Wait 30 minutes after the last observed lightning or thunder before resuming outdoor work.

Extreme Heat

When the Humidex reaches 35 or higher, HCMI implements the heat stress protocol: increased water breaks (every 20 minutes), shaded rest areas, buddy system monitoring, and modified work schedules to avoid peak heat hours. Workers showing signs of heat exhaustion (heavy sweating, weakness, nausea, dizziness) must stop work and be moved to a cool area immediately.

8. Medical Emergency Response

The HCMI medical emergency response chain:

  1. Assess the scene for safety. Do not become a second casualty. Ensure the hazard that caused the injury is controlled.
  2. Call 911 if the injury appears serious (unconsciousness, severe bleeding, suspected fractures, chest pain, difficulty breathing, falls from height).
  3. Provide first aid using your training. At least one certified first aider per O. Reg. 1101 must be on site at all times. Use the first aid kit and AED (where available).
  4. Do not move the injured person unless they are in immediate danger (fire, structural collapse, toxic atmosphere).
  5. Notify the site supervisor who will coordinate with emergency services, ensure the access route is clear, and assign someone to meet the ambulance at the site entrance.
  6. Document the incident in the first aid log and complete an HCMI incident report within 24 hours.

9. Critical Injury Notification

A critical injury as defined by O. Reg. 834 includes any injury that places life in jeopardy, produces unconsciousness, results in substantial loss of blood, involves a fracture of a leg or arm (not a finger or toe), involves amputation of a leg, arm, hand, or foot, consists of burns to a major portion of the body, or causes loss of sight in an eye.

The HCMI critical injury notification sequence:

  1. Provide emergency first aid and call 911.
  2. Secure and preserve the accident scene. Do not disturb anything except to provide first aid or prevent further injury.
  3. Call the MLITSD Health and Safety Contact Centre at 1-877-202-0008 immediately (OHSA s.51).
  4. Notify the JHSC or health and safety representative immediately.
  5. Notify the HCMI safety coordinator and project manager immediately.
  6. A written report must be submitted to the MLITSD Director within 48 hours (OHSA s.52).
  7. File WSIB Form 7 within three business days.

Critical Warning: Under OHSA s.51(2), no person shall interfere with, disturb, destroy, alter, or carry away any wreckage or thing at the scene of a critical injury until a Ministry of Labour inspector gives permission. This means the work area remains shut down and undisturbed. Violating this section is a serious offence.

10. Communication Equipment

Every HCMI construction site must have reliable communication equipment for emergency response:

11. HCMI Emergency Plan Template

Every HCMI project uses a standardized emergency plan template that includes the following sections, completed by the site supervisor before work begins:

  1. Project name, address, and nearest intersection.
  2. Constructor and employer information.
  3. Site map with evacuation routes, muster points, fire extinguisher locations, first aid stations, and utility shut-offs.
  4. Emergency contact list (911, MLITSD, HCMI head office, project manager, safety coordinator, nearest hospital with directions).
  5. Names and qualifications of designated first aiders on site.
  6. Specific procedures for: fire, medical emergency, critical injury, severe weather, structural collapse, hazardous material spill, and utility failure.
  7. Communication plan (alarm signals, radio channels, phone tree).
  8. Special considerations (adjacent active worship spaces, school zones, daycare proximity, public access areas).
  9. Drill schedule (minimum one evacuation drill per project phase).
  10. Plan review dates and revision log.

The completed template is reviewed by the HCMI safety coordinator before work begins and is posted in the site trailer. A copy is maintained in the HCMI head office project file.

12. Drills & Review

HCMI requires emergency evacuation drills at the following intervals:

Drills are documented with the date, time, number of participants, evacuation time, and any deficiencies noted. Corrective actions for deficiencies must be implemented before the next work shift. Drill records are maintained in the project safety file.

The emergency plan is reviewed and updated whenever site conditions change, at minimum monthly during active construction, and after any actual emergency event.