Table of Contents

  1. Purpose & Scope
  2. Legal Requirements
  3. Types of Scaffolding
  4. Erection & Dismantling
  5. Daily Inspection Requirements
  6. Load Ratings & Capacity
  7. Guardrails & Fall Protection
  8. Access & Ladders
  9. Aerial Lifts — Boom & Scissor
  10. HCMI Scaffold & Lift Policy
  11. Daily Scaffold Inspection Checklist

1. Purpose & Scope

Scaffolds and elevated work platforms are essential on nearly every HCMI church construction project — from exterior masonry and cladding to interior ceiling work in sanctuaries and gymnasiums. Falls from scaffolds and aerial lifts remain one of the leading causes of serious injury and death in Ontario construction. This guide covers the regulatory requirements, safe work practices, and HCMI-specific policies for all scaffold and elevated platform work.

This training applies to every HCMI worker who erects, dismantles, inspects, or works from scaffolding, as well as anyone who operates or works from a boom lift, scissor lift, or other elevating work platform.

Scaffold and elevated work platform requirements for Ontario construction projects are set out in O. Reg. 213/91 (Construction Projects):

Regulatory Note: Under O. Reg. 213/91 s.125, a scaffold must be designed by a professional engineer if it is more than 15 metres (50 feet) in height, or if it is a non-standard configuration. The engineer's design drawings must be available on-site.

3. Types of Scaffolding

Frame Scaffold (Most Common)

Pre-fabricated steel frames that stack vertically with cross-bracing. This is the most common scaffold type on HCMI projects. Frames come in standard widths (typically 5 feet) and heights (typically 5 feet per section). Frame scaffolds are economical and quick to erect for straightforward, flat-wall applications such as exterior brick or stone installation on church buildings.

Tube-and-Clamp (Tube-and-Coupler) Scaffold

Individual steel tubes connected with forged steel clamps. This system is highly versatile and can be configured around complex building geometries — ideal for church steeples, curved walls, and irregular facades. Erection requires more skill and time than frame scaffold. All clamps must be tightened to manufacturer-specified torque.

Rolling (Mobile) Scaffold

A scaffold mounted on casters for repositioning. Commonly used for interior work such as ceiling installation, painting, and mechanical/electrical rough-in in church sanctuaries and fellowship halls. O. Reg. 213/91 s.130 requires that castors have functional brakes that are locked whenever workers are on the platform. The height-to-base ratio must not exceed 3:1 unless the scaffold is secured to prevent tipping.

Suspended Scaffold (Swing Stage)

A platform suspended by ropes or cables from roof-mounted outriggers. Used for exterior work on tall church facades where ground-based scaffolding is impractical. O. Reg. 213/91 s.144-153 imposes stringent requirements including engineered rigging, independent safety lines, and operator training. Workers on swing stages must wear a full-body harness connected to an independent lifeline at all times.

4. Erection & Dismantling

O. Reg. 213/91 s.126 requires that scaffolds be erected, altered, and dismantled under the supervision of a competent person. Key requirements:

  1. Foundation: Scaffolds must be erected on firm, level surfaces. Use base plates and mudsills to distribute loads. Never place scaffold legs on unstable ground, ice, or backfill that has not been properly compacted.
  2. Plumb and level: Each section must be checked for plumb and level as it is erected. Use spirit levels and plumb bobs. Out-of-plumb scaffolds are prone to collapse.
  3. Cross-bracing: Install all cross-braces as the scaffold is erected. Never omit bracing to create walk-through openings — use bracing with integrated gates instead.
  4. Tie-ins: Secure the scaffold to the building structure at intervals specified by the manufacturer or engineer. Typical requirement: every 3 bays horizontally and every 4 metres vertically.
  5. Planking: Scaffold platforms must be fully planked with no gaps greater than 25 mm (1 inch). Planks must overhang their supports by at least 150 mm (6 inches) but no more than 300 mm (12 inches). Planks must be scaffold-grade lumber or manufactured scaffold decking.
  6. Dismantling: Remove components from top down. Never pull scaffolding apart from the bottom. Maintain bracing and tie-ins until the final sections are removed.

HCMI Requirement: A green "Scaffold Safe for Use" tag must be attached to every scaffold on HCMI projects before workers may use it. If a scaffold is incomplete, damaged, or under construction, a red "Do Not Use" tag must be displayed. Only the competent person who inspected the scaffold may attach the green tag.

5. Daily Inspection Requirements

O. Reg. 213/91 s.131 requires that a competent person inspect scaffolds before each work shift and after any event that could affect structural integrity (wind storm, impact, alteration). The daily inspection must verify:

Inspection results must be documented on the HCMI Daily Scaffold Inspection Form. Any deficiency must be corrected before workers use the scaffold, or the scaffold must be tagged "Do Not Use" until repairs are completed.

6. Load Ratings & Capacity

Every scaffold must have a rated load capacity established by the manufacturer or the designing engineer. O. Reg. 213/91 s.127 states that no scaffold shall be loaded beyond its rated capacity.

The rated capacity must account for the combined weight of workers, tools, materials, and the scaffold platform itself. On HCMI church projects, brick and stone masonry is common — ensure scaffolds used for masonry are rated for heavy duty and that material is distributed evenly, not concentrated on one section.

7. Guardrails & Fall Protection

O. Reg. 213/91 s.26.3 and s.128 require guardrails on all open sides and ends of scaffold platforms where a worker could fall 2.4 metres (8 feet) or more. The guardrail system must include:

Where guardrails are not feasible (for example, during erection and dismantling), workers must use a personal fall arrest system — full-body harness, shock-absorbing lanyard, and adequate anchorage point. On HCMI projects, workers erecting or dismantling scaffolds above 3 metres must wear fall arrest at all times.

8. Access & Ladders

O. Reg. 213/91 s.129 requires safe access to all scaffold platforms. Workers must never climb cross-bracing or scaffold frames to reach the platform.

9. Aerial Lifts — Boom & Scissor

Aerial lifts (elevating work platforms) are regulated under O. Reg. 213/91 s.142-143 and CSA B354 standards.

Operator Requirements

Boom Lifts (Articulating & Telescoping)

Scissor Lifts

Regulatory Note: O. Reg. 213/91 s.142(1) requires that an elevating work platform be operated and maintained in accordance with the manufacturer's written instructions. A copy of the operator manual must be available on-site for each lift in use.

Daily Aerial Lift Inspection

Before each shift, the operator must inspect and verify:

10. HCMI Scaffold & Lift Policy

  1. Competent Person: A designated competent person must supervise all scaffold erection and dismantling on HCMI sites. This person must have documented training and experience in scaffold construction.
  2. Tagging System: All scaffolds must display a green "Safe for Use" or red "Do Not Use" tag. The tag must include the date, the inspector's name, and the rated load capacity. Tags are available from the HCMI site trailer.
  3. Stair Tower Requirement: Scaffolds exceeding 6 metres in height on HCMI projects must be equipped with a stair tower for access. Ladder-only access is permitted below 6 metres only.
  4. Aerial Lift Operator Card: All aerial lift operators on HCMI sites must carry a valid operator training card for the type of lift they are operating. Training records are verified by the site superintendent before first use.
  5. Overhead Power Lines: No scaffold or aerial lift shall be set up or operated within 6 metres of an energized overhead power line without a written safe work procedure approved by the HCMI Project Manager and the utility company.
  6. Wind Policy: Scaffold work is suspended when sustained wind speeds exceed 40 km/h or gusts exceed 50 km/h. Aerial lift work is suspended per manufacturer limits, typically 28-45 km/h depending on the model.
  7. Incident Reporting: Any scaffold collapse, near-miss, or aerial lift malfunction must be reported to the HCMI Safety Coordinator immediately and documented on the HCMI Incident Report Form.

11. Daily Scaffold Inspection Checklist

Complete before each work shift:

Remember: If you observe any scaffold deficiency, do not use the scaffold. Report it to the competent person immediately. Working from a deficient scaffold is a violation of the OHSA and puts your life at risk.

← Back to Employee Portal